-
Hydraulic Excavator Parts
-
Hydraulic Pump Excavator Parts
-
Excavator Spare Parts
-
Travel Motor Assy
-
Swing Motor Assy
-
Travel Gearbox
-
Excavator Swing Gearbox
-
Slewing Ring Bearing
-
Planetary Gear Parts
-
Hydraulic Gear Pump
-
Hydraulic Pump Regulator
-
Excavator Control Valve
-
Excavator Relief Valve
-
Mini Wheeled Excavator
-
Excavator Controller
-
hydraulic Cylinder Assy
-
Diesel Engine Assembly
-
Hernan AlvarezBelparts has always been our partner. The quality and after-sales service of the products they supply are very good, worthy of our trust.
Excavator DX255 excavator swing motor swing drive K1004037A gearbox

Contact me for free samples and coupons.
Whatsapp:0086 18588475571
Wechat: 0086 18588475571
Skype: sales10@aixton.com
If you have any concern, we provide 24-hour online help.
xModel Name | DX255 | Brand Name | Belparts |
---|---|---|---|
Part Number | 2101-1025I K1004037A | Place Of Origin | Guangdong, China |
Port | Huangpu, Guangzhou | Material | Steel |
Supply Ability | 1000pcs | MOQ | 1PC |
Excavator DX255 excavator swing motor swing drive K1004037A gearbox
Product Description
swing reduction |
|
Place of Origin: |
China(mainland) |
Model: |
DX255 |
Part Name: |
2101-1025I K1004037A |
MOQ: |
1 PCS |
Payment term: |
T/T & Paypal |
Delivery time: |
Within 2 days after receiving the payment |
Packing: |
Standard exporting packing or as required |
List of spare parts
# | Part No | Part Name | Comment | Qty. |
---|---|---|---|---|
- | K1004037A | REDUCTION GEAR, SWING | 243 kg | 1 |
1 | K1004038B | SHAFT | 28 kg | 1 |
2 | K1002539A | CASING, GEAR | 1 | |
3 | K1002540A | CARRIER, NO.2 | 19 kg | 1 |
4 | K1002541A | GEAR, SUN NO.2 | 4 kg | 1 |
5 | K1002542 | GEAR, PLANETARY, NO.2 | 4 kg | 4 |
6 | K1002543 | PLATE, SIDE NO.2 | 4 | |
7 | K1002544 | PIN, NO.2 | 1 kg | 4 |
8 | K1002545 | BUSHING, NO.2 | 4 | |
9 | K1002546 | CARRIER, NO.1 | 7 kg | 1 |
10 | K1004040B | GEAR, SUN NO.1 | 2 kg | 1 |
11 | K1002548 | GEAR, PLANETARY, NO.1 | 2 kg | 3 |
12 | K1002549 | PLATE, SIDE NO.1 | 3 | |
13 | K1002550 | PIN, NO.1 | 1 kg | 3 |
14 | K1006981 | GEAR, RING | 35 kg | 1 |
15 | K1002552 | PLATE, THRUST | 1 | |
17 | K1003384A | PIN, LOCK | 4 | |
18 | K1002554A | SPACER | 1 kg | 1 |
19 | K1004041A | COLLAR | 1 | |
20 | K1002556 | PLATE | 1 kg | 1 |
21 | K1002558 | RING, LOCKING | 1 | |
22 | K1002559 | BEARING, SPHERICAL, 23224 | 12 kg | 1 |
23 | K1003682A | BEARING, ROLLER, NJ224E | 16 kg | 1 |
24 | K1005719 | SEAL, OIL | 1 kg | 1 |
25 | S5741361 | PIN, SPRING | 4 | |
26 | 2181-1116D4 | PLUG, RECHECK | 97123-04111 | 1 |
27 | S5810010 | PLUG | 3 | |
28 | K1004042A | GEAR, PINION | 17 kg | 1 |
29 | S2226671 | BOLT, HEX SOCKET | 12 | |
30 | 140-01343A | PIPE, HYDRAULIC | 1 | |
31 | 119-00020 | BAR, LEVEL | 1 | |
32 | K1002567 | PLATE, SIDE NO.3 | 3 | |
33 | S6500600 | RING, RETAINING | 3 | |
34 | 2120-1363 | BOLT | 4 | |
35 | 2403-1039A | PLATE, LOCK | 1 kg | 1 |
36 | 2126-9001 | WIRE (1.4X250) | 1 | |
37 | K1003386 | BUSHING, NO.1 | 3 | |
40 | K9004901 | CARRIER NO.1 ASS'Y | 14 kg | 1 |
41 | K9004902 | CARRIER NO.2 ASS'Y | 31 kg | 1 |
Company Information
GZ Belparts Engineering Machinery Co., Ltd, founded in September 2013, is a foreign trade company, which is specialized in
procuring and selling excavator parts.
Our main products are excavator hydraulic pump, hydraulic parts, travel motor and gearbox, swing motor, and gearbox. Our products
have been exported to more than 100 countries and regions.
Our main products are excavator hydraulic pump, hydraulic parts, travel motor and gearbox, swing motor, and gearbox. Our products
have been exported to more than 100 countries and regions.
Moreover, we keep close cooperation with foreign customers, forming a business model of procurement. Our company helps many foreign companies to procure excavator parts in China professionally.
Our company is strict with the quality of products. We provide customers with great support in technologies, helping customers procure various quality goods, striving for good warranty terms. We collect the spare parts from all kinds of factories and suppliers, then, putting the goods together in our warehouse, contacting shipping companies, completing the declaration of export commodities. All of the exporting issues in China will be settled by our company, which saves customers more time and energy to expand their own market.
Factory
Delivery
-
Packaging Details:
-
1.According to orders, pack the spare parts one by one by oil paper;
-
2.Put them into small carton boxes one by one;
-
3.Put the packed small carton boxes into bigger carton boxes one by one;
-
4.Put the bigger carton boxes into wooden boxes if necessary especially for the shipments by sea.
-
5. Goods is packed with oil paper and plastic bags inside
-
6.Using wooden case package.
-
7.We support the custom-made demand for package
Processing&Testing
Certifiions
Exhibition
Customer Evaluation
Hot Products
FAQ
-
1.What are your payment terms?
-
You can pay by T/T, PalPal, and Alibaba Trade Assurance.
-
-
2.How about your lead time?
-
Once we receive your payment, we will arrange to send it to the shipping company within 1-2days, detailed delivery period depending on the parts and quantity you order.
-
-
3.What's the warranty of your products?
-
Our parts have a 3-24 months warranty against delivery date, detailed warranty period depends on the parts you order.
-
-
4.If I am also interested in your other parts, what should I do?
-
please contact us directly for inquiry, provide detail part name model number or part number, thanks.